吊点 [
diào diǎn]
suspension centre
- 3每个支吊点的荷载为前后两跨段所分配荷载之和。
The load at each bearing point is the sum of the two distributed load on two ends. - 吊点必须设在屋架三汇交节点上.屋架起吊时离地50㎝时暂停,检查无误后再继续起吊.
Three points must be located in the roof hanging intersection nodes. Roof lifting at 50 cm from the suspended after inspections continue lifting unmistakable. - 包装箱上应标注构件、零件的名称、编号、重量、重心和吊点位置等,并应填写包装清单。
On package, name of members or spare parts, series number, weight and suspending point should be marked, and package list should be filled in.